A Level 2 charger in your Whittier garage or driveway, with the panel question answered before anyone quotes you. We run the load calculation, pull the City of Whittier permit, and handle the SCE Charge Ready Home paperwork when a panel upgrade and EV outlet qualify. Licensed, bonded and insured, with a 3-year workmanship guarantee.
Licensed electricians • Load calculation included • No obligation
Two out of three Whittier homes were built before 1960, and most of them can still take a Level 2 charger. What changes from house to house is how much work sits between the panel and your parking spot, and that depends on when the house was built.
Craftsman and Spanish Revival houses from the 1900s to the 1930s often have a small service and a garage set back at the rear of the lot. Expect a longer circuit run, sometimes a trench, and a closer look at wiring that has been added to over the years.
Ranch and tract homes from the 1950s and 1960s usually have an attached garage with the panel on an outside wall, which keeps the run short. Many still have the 100-amp service they were built with, so the load calculation decides the job.
A warm plug or a burning smell is not a scheduling question. Stop charging and call us the same day.
The same crew runs the load calculation, does the work and meets the inspector, so nothing gets lost between the quote and the sign-off.
A dedicated 240V circuit sized to your charger, mounted, tested and commissioned.
Hardwired Wall Connector or Universal Wall Connector, with power sharing for two cars.
Panel and EV outlet work quoted together when the load calculation shows an upgrade is needed.
Adds breaker spaces near a rear garage when the load calculation confirms enough existing service capacity.
New service, meter and main panel when the load calculation says the house needs it.
Chargers for shops, offices and apartment parking. Scoped as a separate project.
Running a business in town? See our Whittier commercial electrician page.
Level 1 is the cord that came with your car, plugged into a regular outlet. Level 2 is a wall charger on its own 240V circuit. For a battery EV driven every day, Level 2 is what keeps the car full without planning around it.
you drive a plug-in hybrid, or the car covers short trips around Whittier and sits parked most nights.
you commute on the 605 or the 60, run two EVs, or want a full battery every morning whatever yesterday looked like.
Swipe left to see the full Level 2 column.
| Level 1 | Level 2 | |
|---|---|---|
| Power | 120V household outlet | 240V dedicated circuit |
| Range added per hour | 3 to 5 miles | 20 to 40 miles |
| Overnight result | Tops up a plug-in hybrid | Fills most battery EVs |
| Electrician and permit | Usually not needed | Required |
| SCE Charge Ready Home | Not eligible | Eligible outlet work |
The full side-by-side is in our guide to Level 1 vs. Level 2 EV chargers.

The Wall Connector goes in hardwired on its own breaker, and we set its current limit during commissioning to match that breaker. If a second Tesla is coming, we wire for power sharing now so the two units split one circuit later. The Universal Wall Connector, with its built-in adapter for other makes, installs the same way.
Details and options on our Tesla Wall Connector installation page.
Already bought one? We install it. Still choosing? Tell us the car and where you park, and we will recommend a unit that suits your circuit and your wall.
We answer the panel question with an Article 220 load calculation, not a guess from the label on the door. That result, together with the panel’s condition and its compatibility with the new breaker and charger, decides which column your home lands in.
When a panel upgrade is needed, we can quote it alongside the EV outlet installation. Eligible projects may qualify for SCE Charge Ready Home. See electrical panel upgrades in Whittier for that side of the work.
Your parking spot sets most of the scope. These are the four we see most in Whittier.
Usually the shortest run. The charger goes on the wall nearest the panel, and the circuit stays indoors.
Needs a feed from the house, often underground. A small sub-panel in the garage leaves room for lights, tools or a second charger later.
Hillside homes often park on the driveway. We use an outdoor-rated, hardwired unit placed so the cable reaches the port without crossing the walkway.
Needs HOA approval and sometimes a feed from a common panel. We scope it and give you a written plan to take to the board.

Every new charger circuit inside city limits needs an electrical permit from the City of Whittier Building and Safety Division. We pull it, and here is what that involves.
Building and Safety, part of the Community Development Department at City Hall, 13230 Penn Street. The permit goes to the homeowner or a licensed C-10 electrical contractor, and we pull it as your contractor.
Through the city’s online permits and inspections portal. You do not need to visit the counter or wait in line at City Hall.
A site plan showing where the charger mounts and the manufacturer’s spec sheet for the unit. We add the load calculation so the circuit size is documented from the start.
Hadley-Greenleaf, College Hills, Central Park and Earlham are local historic districts. Interior work is routine, but an exterior charger or new conduit on a street-facing wall can draw a closer look, so we check your address before we plan the route.
Unincorporated addresses are permitted by LA County Public Works, not the city. We file those through the county’s online permit system under its EV charging checklist.
We schedule the final inspection, meet the inspector and leave you the signed-off permit for your records.
Permit fees follow the city’s or county’s current fee schedule and show up as a line item on your written quote.
Whittier is a Clean Power Alliance city, so your bill may list CPA as the power supplier. Southern California Edison still delivers that power and holds your account, and Charge Ready Home asks for an active SCE residential account. The program pays toward the panel upgrade and the 240V outlet, not the charger.
When your main panel is under 200 amps and cannot support Level 2 charging. Income-qualified applicants may receive up to $4,200, limited to eligible costs. Applicants qualifying only by address may receive up to $2,100, limited to 50% of eligible costs.
When your existing panel is 200 amps or more, or has sufficient capacity, and only needs the dedicated circuit and outlet. Income-qualified applicants may receive up to $1,000, limited to eligible costs. Applicants qualifying only by address may receive up to $500, limited to 50% of eligible costs.
Eligibility is based on household income or on your address being in an SB 535 disadvantaged community. Several census tracts in Whittier, South Whittier and West Whittier-Los Nietos are on the state’s SB 535 map, so check SCE’s address lookup before you rule yourself in or out. Income-qualified applicants may receive up to $4,200 for panel-and-circuit work or up to $1,000 for circuit-only work, limited to eligible costs. Applicants qualifying only by address may receive up to $2,100 or $500 respectively, limited to 50% of eligible costs. Circuit-only applicants may qualify with an existing panel of 200 amps or more, or sufficient capacity on their existing panel. SCE decides eligibility and funding.
Submit your SCE application and get a Prequalification ID.
Pass us the ID and we attach your project to it.
Panel, outlet, permit and inspection, documented for SCE.
The rebate goes to us, so you never front that amount.

SCE decides eligibility and funding, and program funds are limited, so we never promise an amount. The federal 30C charger credit ended for equipment placed in service after June 30, 2026.
Full program rules: how the SCE Charge Ready Home rebate works.
Your installation price is quoted after an on-site assessment of the panel, circuit route, charger and permit requirements.
How far the charger sits from the panel.
Attic, wall, surface conduit or a trench under the yard.
Stucco, block or concrete that has to be cut and patched.
A 60-amp charger needs heavier wire than a 32-amp one.
Open spaces, a sub-panel, or a full upgrade.
Power sharing or a second circuit adds a little now.
A line-by-line breakdown is in our home EV charger installation cost guide.
We check the panel, measure the run and do the load calculation on site.
One price for the circuit, mounting, permit and any panel work.
We file the electrical permit with the City of Whittier.
Most installs take 3 to 6 hours. A trench or panel upgrade adds a day.
We meet the inspector, test the charger with your car and leave you the signed permit.
A service upgrade also needs SCE to disconnect and reconnect the meter. That appointment usually sets the schedule, and we book it for you.
If your panel can carry the charger, we tell you, even when an upgrade would be the bigger ticket. Every job starts with the load calculation, and the written quote is the price you pay.
From Uptown and the College Hills streets to East Whittier, Friendly Hills and Murphy Ranch, our crews drive over from Downey for charger, panel and service work.
Whittier neighborhoods we work in: Uptown • College Hills • East Whittier • Friendly Hills • Murphy Ranch • Whittwood • Leffingwell Ranch.
Outside these? Call anyway, or see our full service area and our Whittier electrician page.
⭐⭐⭐⭐⭐
Aimee, Downey
⭐⭐⭐⭐⭐
“Michael and his crew really came through. These men have done a few different jobs for me over the past two years and I’ll certainly be calling them again if the need ever arises. If you are looking to get some electrical work done by licensed bonded and clean cut professionals that do a great job, give Saiyan Electric the opportunity to serve you, I think you’ll be happy you did. Cheers.”
Donald, Cerritos
Yes. A new charger circuit needs an electrical permit from the City of Whittier Building and Safety Division, filed through the city’s online permit portal with a site plan and the charger’s spec sheet. Unincorporated South Whittier addresses are permitted by LA County Public Works instead. We file either one and meet the inspector.
Not always. Many 100-amp homes with gas heat, a gas water heater and a gas range can take a 40-amp charger once the load calculation is done. Homes with Zinsco or Federal Pacific panels, or a calculated load over the service rating, need the panel upgraded first.
The program asks for an active SCE residential account. Clean Power Alliance customers in Whittier still have SCE as their delivery utility, so check your address and income on SCE’s eligibility lookup. Income-qualified applicants may receive up to $4,200 for panel-and-circuit work or up to $1,000 for circuit-only work, limited to eligible costs. Applicants qualifying only by address may receive up to $2,100 or $500 respectively, limited to 50% of eligible costs. Circuit-only applicants may qualify with an existing panel of 200 amps or more, or sufficient capacity on their existing panel. SCE decides eligibility and funding.
Yes. We run a feed from the house, usually underground, and often set a small sub-panel in the garage. It costs more than an attached-garage install because of the trench, and the quote shows that as its own line.
Most Level 2 installs take 3 to 6 hours on one visit. A trench to a rear garage or a panel upgrade can add a day, and a service upgrade also depends on SCE’s meter appointment.
Yes. We hardwire the Tesla Wall Connector and the Universal Wall Connector on a dedicated circuit, set the current limit to match the breaker, and wire power sharing for two cars.
Tell us the car and where you park. We will check the panel, run the load calculation and give you a written price, permit included, before you commit.
Schedule Your EV Charger Installation
(310) 780-0191
info@saiyanelectric.com
Whittier & Nearby Cities
On site load calculation, no obligation
Need an electrician today?
Same-day service across Downey, LA County and North Orange County.

At Saiyan Electric, we are committed to seeking first the Kingdom of God and His righteousness in all that we do. We strive to provide exceptional electrical services with integrity, professionalism, and a heart of service.
Contact
Hours
© 2026 Saiyan Electric. All rights reserved.
Website & SEO by ProofPilot