Make home or workplace charging more convenient with professional EV charger installation from a licensed Long Beach electrician. We evaluate your electrical system, install the appropriate charging equipment, and handle the electrical work needed for a reliable setup.
Licensed electricians • Load calculation included • No obligation
A standard household outlet can charge an electric vehicle, but charging can take significantly longer. A Level 2 charger uses a 240V circuit to provide faster home charging and is a common choice for drivers who want to charge overnight or between daily trips.
The right installation starts with your home’s electrical system. Before recommending a circuit or charger configuration, we look at your existing panel, electrical load, available capacity, charger requirements, and the distance between the panel and charging location.
That helps us determine what the installation actually requires instead of treating every home as the same.

Adding an EV charger can increase the home’s electrical demand. That’s why we evaluate the existing system before installing a new circuit.
We look at the existing electrical service and panel configuration to determine whether the system can support the added EV charging load.
Your home’s current electrical demand helps determine how much additional capacity is available for a new EV charger.
The panel needs an appropriate way to supply the new circuit, which may depend on available breaker space and the existing configuration.
Different EV chargers have different electrical requirements, so we review the charger’s specifications before planning the installation.
View our panel upgrade service and learn about 200-Amp Panel Upgrades
Most homes end up on Level 2. Here is how the three charging levels compare, and what each one takes on the electrical side.
Level 1 charging uses a standard 120V household outlet. It can work for drivers with low daily mileage or those who have plenty of time between trips.The tradeoff is charging speed. A standard outlet provides less power than a dedicated Level 2 charger, so restoring a larger amount of driving range can take much longer.
Level 2 charging uses a 240V circuit and is designed for faster residential charging.A typical installation includes a dedicated circuit from the electrical panel to the charger location. Depending on the charger and the home's electrical system, the installation may be hardwired or use a properly installed NEMA 14-50 receptacle.For many homeowners looking for a dedicated home charging setup, Level 2 is the option worth discussing first.
DC fast chargers are designed for much higher charging power than typical residential Level 2 equipment. They also have substantially different electrical requirements.They are generally associated with commercial, fleet, and public charging applications rather than a typical home installation. If your project involves higher-capacity EV charging, Saiyan Electric can evaluate the electrical requirements and installation scope.
Both are code-compliant. The choice is about where you want the flexibility.
Lets you unplug the charger, take it with you, and swap units without an electrician. It also requires GFCI protection at the breaker, and a GFCI breaker at that amperage is not cheap, which narrows the price gap more than people expect. Receptacles also wear, especially one that gets plugged and unplugged or sits outdoors near the water.
Removes the receptacle and the GFCI breaker from the equation, and it is the only way to run above 48 amps. It is also the manufacturer’s preference on most outdoor installations, which matters in Belmont Shore, Naples and the Peninsula where salt air is a real corrosion factor.
We tell you which one your location argues for rather than defaulting to whichever is faster to install.
We are not tied to one manufacturer. If you already bought a unit, we install it. If you have not, we will recommend one based on your circuit size, whether the location is indoors or out, and whether you want load management or utility rate integration.

Driving a Tesla? See Tesla Wall Connector installation.
Installing an EV charger starts with understanding your property’s electrical system and ends with a tested charging setup. Our electricians follow a straightforward process to identify the electrical requirements and complete the installation at your Long Beach home or business.
We inspect your electrical panel, available capacity, existing load, and proposed charger location to determine the electrical requirements for your installation.
We review your charger’s specifications and determine the appropriate location, circuit, wiring, and installation approach for your home or business.
We install the required dedicated circuit, breaker, wiring, conduit, and other electrical components based on your charger’s requirements and property.
We securely install and connect your EV charger according to the manufacturer’s specifications and the requirements of your property’s electrical system.
We test the charger and electrical connections after installation to verify proper operation and complete any applicable permit or inspection requirements.
An EV charger needs an electrical permit from the City of Long Beach. An unpermitted charger is a problem at resale and a potential insurance issue. We pull it as part of the job.
Under Long Beach Municipal Code Chapter 18.76, adopted to comply with California’s EV permit streamlining laws, a straightforward residential charger can go through the city’s Express Permit Service and be issued the same day at the Permit Center instead of sitting in plan review.
That third item matters more than it reads: the meter-collar devices marketed as a way to skip a panel upgrade do not clear this checklist in Long Beach.
The shoreline, Belmont Shore, Naples and the Peninsula. Any property inside the Coastal Zone is excluded from the express checklist.
Any designated historic district or qualified historic building, which includes Bluff Park and Rose Park among others.
You can still have a charger. The job goes through a plan review submittal instead, and it should be scoped and priced that way from the start rather than discovered at the counter.
Long Beach’s older neighborhoods are full of alley-facing detached garages, and a run from a front-of-house panel clears 75 feet regularly. When it does, the answer is usually a sub-panel at the garage rather than one long home run.
After the permit comes the inspection. We file through the Building and Safety Bureau at the Permit Center on W. Ocean Blvd., schedule the inspection, meet the inspector, and hand you the signed-off permit with the job.
Long Beach Utilities is the city's gas and water provider. Your electricity comes from Southern California Edison, which means Long Beach homes are eligible for SCE's residential EV programs. Homes a few miles north inside the City of Los Angeles are on LADWP and are not.
Charge Ready Home pays for the panel upgrade, not the charger. If your main panel is under 200 amps and has to grow to support Level 2 charging, this is the rebate that applies to that work.
Household income under 80 percent of area median income, or enrollment in a program such as CalFresh, Medi-Cal, LIHEAP, WIC, SSI or CalWORKs.
Home is in a designated disadvantaged community on the state’s SB 535 map.
Eligibility, funding and approval are SCE’s decision, not ours, and we never promise an amount. We handle the contractor side of the application, coordinate the permit and inspection, and stay with it through to the rebate.
The Section 30C credit that covered 30 percent of charger and installation costs, up to $1,000, ended for property placed in service after June 30, 2026. Articles still advertising it are out of date. Ask your tax advisor, not a contractor.
More on our SCE Charge Ready Home program page.
We do not publish a price for this job, because two Long Beach installs rarely cost the same. The table shows what each part of the work depends on, and the list below it shows what moves your total most.
| Line item | What decides the cost |
|---|---|
| Level 2 charger unit | The model you choose. Higher-output and premium units cost more |
| Installation, panel nearby with capacity | A short indoor run from a panel that already has room. The simplest version of the job |
| Installation, long run, trenching or exterior work | Run length, trenching, conduit and the stucco or drywall repair that follows |
| Sub-panel, where the main service has capacity | Varies with distance and panel size |
| 200-amp service upgrade, when actually required | The largest single variable in the project |
| City electrical permit | Set by Long Beach’s published fee schedule, itemized on your quote |
Your number comes from a site visit and a load calculation, written and itemized before anything starts. Call (310) 780-0191 or request a free assessment to get it.
The number one driver. Every foot is conductor and labor.
Exterior, underground and hardscape crossings add trenching, patching and stucco or drywall repair.
A charger on a panel with room is a fraction of a charger plus a service upgrade.
A 60-amp circuit uses noticeably heavier conductor than a 40-amp one.
Plan review instead of an express permit adds time and cost.
For a fuller breakdown, see home EV charger installation cost and EV charger installation costs in California.
Choosing an EV charger installer in Long Beach comes down to one question: will they run the load calculation before they quote you a panel upgrade? We do, every time, and we tell homeowners when they do not need one.
We work across Long Beach every week, from the pre-war bungalows in Rose Park and Wrigley to the newer builds in Los Altos and El Dorado Park, and we know which neighborhoods hit the Coastal Zone and historic-district permit paths before we quote them. Charging in Norwalk instead? See EV charger installation in Norwalk. For the wider area, see EV charger installation in Los Angeles.
⭐⭐⭐⭐⭐
– Aimee., Downey
⭐⭐⭐⭐⭐
“Michael and his crew really came through. These men have done a few different jobs for me over the past two years and I’ll certainly be calling them again if the need ever arises. If you are looking to get some electrical work done by licensed bonded and clean cut professionals that do a great job, give Saiyan Electric the opportunity to serve you, I think you’ll be happy you did. Cheers.”
– Donald., Cerritos
Yes. An electrical permit from the City of Long Beach is required. A straightforward residential installation can often go through the city’s Express Permit Service and be issued the same day. Properties in the Coastal Zone or a designated historic district go through plan review instead. We pull the permit and meet the inspector as part of the job.
Not always. It depends on your calculated load, not your panel’s label. Many 100-amp Long Beach homes with gas heat, gas water heating and a gas range have room for a 40-amp charger. Where capacity is tight, a sub-panel, a lower-amperage charger or a load management system often solves it without a service upgrade. We run the calculation before we recommend anything.
It depends on your home, so we do not quote it from a web page. The biggest factors are the distance from your panel to where you park, whether the run goes outdoors or underground, the circuit size, and whether your panel has room for the new load. A panel or service upgrade, if one is truly needed, is priced as its own line. You get a written quote after a site visit and a load calculation, before work begins.
Charge Ready Home rebates the electrical panel upgrade, not the charger. Eligible SCE customers may qualify for up to $4,200 on the income-qualified path or up to $2,100 on the geographic path. The existing main panel must be under 200 amps, the upgrade must be to at least 200 amps, and a Level 2 charger must be installed within 180 days. Eligibility and funding are determined by SCE. Long Beach homes are on SCE, so the program applies here.
Hardwiring is our default for outdoor and permanent installations, and it is required above 48 amps. A 14-50 receptacle makes sense if you rent, may move, or want to swap chargers without an electrician. The GFCI breaker a receptacle requires closes much of the price gap between the two.
Yes. Long Beach’s older neighborhoods are full of alley-facing detached garages, and those runs often exceed the 75-foot conductor limit in the city’s express permit checklist. The usual answer is a sub-panel at the garage rather than one long home run. We scope that at the site visit.
Outside these? Call us anyway. See our full service area.
Tell us your address, your EV, and where you park. We will come out, run the load calculation, tell you honestly whether your panel has room, and put the whole scope including the permit in writing before you commit to anything.
Schedule Your EV Charger Installation
(310) 780-0191
info@saiyanelectric.com
Long Beach & surrounding LA County cities
On site load calculation, no obligation
Need an electrician today?
Same-day service across Downey, LA County and North Orange County.

At Saiyan Electric, we are committed to seeking first the Kingdom of God and His righteousness in all that we do. We strive to provide exceptional electrical services with integrity, professionalism, and a heart of service.
Contact
Hours
© 2026 Saiyan Electric. All rights reserved.
Website & SEO by ProofPilot